Our goals for this stage:


First, removing the old stringers:
We sampled several different tools to get the job done, beginning with the cut off wheel. This tool works great for hogging through fiberglass. But the deadrise made sharp angles which the tool couldn't quite access. Not the best option for this job.
We opted for the teeth chattering muscle of the sabre saw next to zip the stringers off. It cut quickly, but the long range of motion risked punching through the hull with one slip, especially on the upward angle of the deadrise. We removed a few stringers with this reciprocating saw, but it left behind high nubs with the remaining core still firmly bedded in place. It still required alot of cleanup work.
The best tool for this job - the multimaster. We hooked on the high speed steel saw blade. While it cut through laminate and plywood slower, the controlled flush cut actually saved more time overall. In fact, once the fiberglass encapsulating the plywood core was cut, we were able to rock and knock the stringer out. We still needed to cut and grind all traces of the stringer away, but there was much less cleanup using the multimaster.








We set in, grinding and cutting away the nubby remains of the stringers. We could have saved this step, because an exploratory peel of some delaminated woven roving became a wholesale removal of the top layer. TJ wedged the pry-bar under the top layer of woven roving in exposed stringer bed. It peeled off like dead skin. Peeling it away revealed the exact composition of the layup, or "schedule." Below the woven roving was a chopped strand mat layer. Below that was the first base layer of fiberglass in the mold. The peel brought most of the chopped strand mat with it. What remains is now a good pinkish hue of solid fiberglass, an excellent bonding surface for our next step.


These samples of Prisma stringers hint towards what comes next.
![]() |
Before |
![]() |
After |
![]() |
Before |
![]() |
After |
The hull now flexes under foot enough to make us squeamish. We have to mind our step. We will address this next before adding in new stringers.
Many grueling hours later we feel good about the results. We're excited to begin building up the inside of this hull.